Quick answer: A freight quote template needs twelve fields: quote number and date, customer, lane, Incoterm and scope, cargo basis, charges grouped by origin, freight and destination, the unit for each charge, currency, validity, transit time, inclusions and exclusions, and payment terms. The two that prevent most disputes are the cargo basis the price was calculated on and a validity date tied to the sailing or flight.
A freight quote is the first document a customer judges you on, and often the only one they read closely. Most forwarders build it from an old email or a spreadsheet tab, so the layout changes with whoever is quoting that day.
That matters more than it looks. A shipper comparing three quotes picks the one they can approve without asking a question. This guide gives you the fields, the wording and two worked examples, one FCL and one air, that you can copy into your own template. (Disclosure: I run Zavin, which prepares quotes automatically. The template below works in a spreadsheet.)
Key takeaways
- A complete freight quote has twelve fields; the two that prevent most disputes are the cargo basis and the validity date.
- State validity as a date tied to cargo ready or sailing date, not "valid 7 days" from the quote date.
- Group charges into origin, main freight and destination, each line with a unit, a quantity and a currency.
- Air freight is priced on chargeable weight: at 1:6000, one cubic metre counts as 166.67 kg.
- For US NVOCCs, a negotiated rate arrangement must be in writing and agreed before the cargo is received, under 46 CFR 532.5.
- Name the exclusions: duties, exams, demurrage and detention beyond free time, and any surcharge that can still move.
What is a freight quote?
A freight quote, or freight quotation, is a forwarder's written offer to move a defined shipment for a stated price, on stated terms, until a stated date. It is narrower than a rate sheet, which lists prices for many lanes, and firmer than an estimate.
Three things make it a quote and not a number in an email: it describes one shipment, it says what is included, and it expires.
Indicative quote vs firm quote
An indicative quote is a price guide sent before every detail is known, for example when the dimensions are missing or a carrier has not confirmed space. A firm quote is one the customer can accept as it stands.
Sending an indicative price fast is good practice, as the research on freight quote response time explains. The rule is to label it. Write "indicative, subject to final dimensions and carrier confirmation" and replace it with a firm quote before anyone books.
The 12 fields every freight quote template needs
| # | Field | What to write | Example |
|---|
| 1 | Quote number and date | A unique reference and the issue date | Q-2611-0412, 23 Nov 2026 |
| 2 | Customer and contact | Legal name and the person who asked | Acme Imports Inc., J. Rivera |
| 3 | Lane | Origin and destination, port or door | Ningbo port to Atlanta door |
| 4 | Incoterm and scope | The term, the named place and what you cover | FOB Ningbo; freight, clearance, delivery |
| 5 | Cargo basis | Equipment or weight, volume, commodity, special handling | 2x40HC, general cargo, non-hazardous |
| 6 | Charges | Lines grouped by origin, freight and destination | See the examples below |
| 7 | Unit and quantity | Per container, per B/L, per kg, per shipment | USD 650 per container x 2 |
| 8 | Currency | One currency for the total, with the rate if converted | USD |
| 9 | Validity | A date, and the event it is tied to | Cargo ready by 15 Dec 2026 |
| 10 | Transit and routing | Estimated transit time, carrier or service, transshipment | About 30 days, direct service |
| 11 | Inclusions and exclusions | What the price covers, what it does not, free time | Excludes duties, exams, storage |
| 12 | Payment terms and conditions | Credit terms and your trading conditions | Net 30; subject to our terms and conditions |
The sections below take the fields in the order a customer reads them: the header, the charges, then the terms.
The header: who, what and when
Quote number, date and customer
Give every quote a unique number, and a new version number when it changes. "Q-2611-0412 v2" tells both sides which price was accepted. Without it, a booking email that says "please proceed as quoted" can point at three different prices.
Lane, Incoterm and service scope
Write the lane as two named places, and say whether each end is a port, an airport or a door. Then write the Incoterm with its named place, such as "FOB Ningbo" or "DAP Atlanta".
The Incoterms 2020 rules published by the International Chamber of Commerce split costs and risk between seller and buyer. They do not tell the reader what your quote covers. So add one line of scope: "Our quote covers ocean freight, US customs clearance and delivery to door. Origin charges are for the shipper's account under FOB." Our guide to Incoterms 2020 covers which charges fall on which side.
The cargo basis the price was calculated on
This is the field most templates leave out. A price is only correct for the cargo it was calculated on, so print that cargo on the quote:
- FCL: number and type of containers, commodity, cargo weight per container, hazardous or not.
- LCL: pieces, gross weight, volume in CBM, stackable or not.
- Air: pieces, dimensions, gross weight, volumetric weight and the resulting chargeable weight.
Then add the sentence that protects you: "Price is based on the details above and will be recalculated if weight, dimensions or commodity differ at pickup." If the customer's request was thin, go back and ask before you price. A freight RFQ template lists the details to collect.
The charges: how to lay out the price
Group charges by origin, freight and destination
Customers compare quotes section by section. Three groups work for almost every shipment:
- Origin: pickup, export clearance, terminal handling, documentation.
- Main freight: ocean or air freight and the carrier surcharges that travel with it.
- Destination: terminal handling, import clearance, delivery, chassis.
If the Incoterm puts a whole group on the other party, keep the heading and write "not included, for shipper's account". An empty section with a reason is clearer than a missing one. For what sits inside each group, see terminal handling charges and BAF, CAF and freight surcharges.
State the unit and quantity on every line
A charge without a unit cannot be checked. Write "USD 650 per container x 2", not "Trucking 1,300". Common units are per container, per bill of lading, per entry, per chargeable kg, per CBM or revenue ton, and per shipment. Where a charge has a minimum, show it: "USD 0.12 per kg, minimum USD 45".
Currency and exchange rate
Total the quote in one currency. If some charges are bought in another currency, either convert them and state the exchange rate and its date, or list them separately and say they will be invoiced at the rate on the invoice date. Mixed currencies with no rule are a common reason an invoice does not match the quote.
The terms: the lines that protect the margin
Validity: a date, tied to an event
"Valid for 7 days" is ambiguous. Seven days from the quote, the acceptance, or the sailing? Write the date and the event: "Valid for cargo ready on or before 15 December 2026" or "Valid for sailings up to 20 December 2026".
The validity of the quote should never run past the validity of the buy rate behind it. The usual failure is a quote accepted after the carrier rate expired, which nobody notices until the carrier invoice arrives.
Which surcharges can still change
Say which lines are fixed and which follow the carrier. Two honest wordings:
- "All-in for the validity period. No further carrier surcharges apply."
- "Carrier surcharges are charged as valid at time of shipment (VATOS)."
Either is acceptable. Saying nothing is not, because the customer will assume the first and the carrier will apply the second.
Inclusions, exclusions and free time
List what the price does not cover. The standard exclusions are duties and taxes, customs examinations and inspections, cargo insurance unless quoted, waiting time at pickup or delivery, and storage, demurrage and detention beyond free time.
Then state the free time itself, in days, for each clock: days at the terminal, days with the container, days of chassis. In US trades, the FMC's billing rule at 46 CFR 541.6 requires a demurrage or detention invoice to show the allowed free time with its start and end dates, so the number will reach the customer either way. A customer who knows the container free time on the quote cannot later say the demurrage or detention bill was a surprise.
Transit time and routing
Give transit as an estimate and say what it measures: port to port, or door to door. Name the service or say "carrier's choice", and state whether the routing is direct or via transshipment. Do not promise an arrival date on a quote; give the planned ETD and ETA at booking.
Payment terms and trading conditions
State the payment terms (cash before release, or net days for approved credit accounts) and reference the terms and conditions of service the quote is subject to. New customers should have signed those conditions and a credit application before the first quote is accepted; our customer onboarding checklist covers the file to collect.
Freight quote template: FCL example
An import quote for 2x40HC of furniture, FOB Ningbo to a warehouse in Atlanta via Savannah. The figures are illustrative, not market rates.
| Charge | Unit | Qty | Rate (USD) | Amount (USD) |
|---|
| Origin | | | | Not included, for shipper's account (FOB) |
| Main freight | | | | |
| Ocean freight Ningbo to Savannah, all-in | per 40HC | 2 | 2,150 | 4,300 |
| Destination | | | | |
| ISF filing | per filing | 1 | 35 | 35 |
| Customs entry | per entry | 1 | 125 | 125 |
| Handling and documentation | per B/L | 1 | 75 | 75 |
| Delivery Savannah to Atlanta, fuel included | per container | 2 | 650 | 1,300 |
| Chassis | per container per day | 2 x 2 days | 45 | 180 |
| Total | | | | 6,015 |
The terms block under the table:
- Basis: 2x40HC, furniture, non-hazardous, up to 18,000 kg cargo weight per container.
- Validity: cargo ready on or before 15 December 2026. Ocean freight is all-in for that period.
- Transit: about 30 days port to port, direct service, estimate only.
- Free time: as per carrier tariff at destination; chassis quoted for 2 days per container.
- Excludes: duties and taxes, customs exams, demurrage, detention and chassis beyond free time, waiting time beyond 2 hours at delivery.
- Payment: net 30 for approved credit; subject to our terms and conditions of service.
Freight quote template: air freight example
An export quote for 2 pallets, 310 kg gross, 2.4 cbm, JFK to Dubai, airport to airport. At 1:6000, 2.4 cbm counts as 400 kg, so the chargeable weight is 400 kg. You can check any shipment with the chargeable weight calculator. Figures are illustrative.
| Charge | Unit | Qty | Rate (USD) | Amount (USD) |
|---|
| Origin | | | | |
| Pickup, 2 pallets | per shipment | 1 | 185 | 185 |
| Screening | per kg, minimum 45 | 400 | 0.12 | 48 |
| AES filing | per filing | 1 | 35 | 35 |
| Air waybill and documentation | per shipment | 1 | 55 | 55 |
| Main freight | | | | |
| Air freight JFK to DXB | per chargeable kg | 400 | 3.10 | 1,240 |
| Fuel surcharge | per chargeable kg | 400 | 0.85 | 340 |
| Security surcharge | per chargeable kg | 400 | 0.15 | 60 |
| Destination | | | | Not included, for consignee's account |
| Total | | | | 1,963 |
Two air-specific lines belong in the terms block. First: "Chargeable weight 400 kg, based on 2 pallets of 120 x 100 x 100 cm; price will be recalculated if re-measured at the warehouse." Second, say whether fuel and security surcharges apply to chargeable or actual weight. Carriers differ, and on light, bulky cargo the gap is large.
For US NVOCCs: when a quote becomes a rate arrangement
In US trades, an NVOCC must charge the rates in its published tariff unless it uses an exemption. The most common one for small and mid-sized NVOCCs is the negotiated rate arrangement, or NRA. An accepted quote can serve as the NRA, but only if it meets the rule.
Under 46 CFR 532.5, an NRA must:
- Be in writing, and contain the names of the parties and of the representatives agreeing to it.
- Be agreed by shipper and NVOCC before the NVOCC receives the cargo. Acceptance can be a signed agreement, a written communication including an email, or a booking made after receiving the terms, if the NRA carries the acceptance sentence the rule prescribes in bold capitals.
- Clearly specify the rate and terms, and the shipment or shipments it applies to.
- Say, if the rate is not all-in, whether additional surcharges, assessorial charges or carrier general rate increases will apply.
One line in the rule is worth knowing when you build the template. For a pass-through charge with no specific amount in the NRA or the rules tariff, the NVOCC may only invoice what it incurs, with no markup. And under 46 CFR 532.7, original NRAs must be kept for five years from the completion of performance. This is a summary for orientation, not legal advice; check your own tariff and counsel.
Common freight quotation mistakes
- No cargo basis. The quote says "1x40HC" and nothing about weight or commodity, so an overweight box or a hazardous cargo is priced as a standard one.
- Validity from the wrong date. "Valid 14 days" counted from the quote, while the buy rate ends on the 30th.
- An all-in number with no breakdown. The customer cannot compare it, and you cannot explain it when one charge moves.
- Exclusions left out. Duties, exams and storage are obvious to you. They are not obvious to a first-time importer.
- No free time stated. The demurrage bill arrives and the quote is silent.
- Two versions, one number. The customer accepts the first price after you sent a second.
- Different layouts per rep. Two people quoting one account in two formats, which is one of the reasons forwarders lose quotes they could have won.
A written freight forwarding pricing strategy fixes the price side of this. The template fixes the document side.
How Zavin prepares the quote
A template in a spreadsheet depends on someone filling every field. Zavin, the AI operating system for freight forwarders, fills them from the request itself.
- Reads the RFQ. Zavin reads the inbound email and its attachments and extracts the lane, Incoterm, equipment, weights and dates. If a detail is missing, it drafts the question.
- Prices from rates on file. Pricing and quote automation lines up the valid buy rates and applies your margin rules. Each quote shows which pricing policy priced it.
- Prepares the document. A branded quote under your identity, with terms, validity and inclusions stated, is ready for approval in under 30 seconds when rates are on file.
- Keeps a person in charge. The team keeps approval control: a person approves before a quote sends, and when floor protection is switched on, a below-floor price is held for a manager.
- Follows up. A follow-up is scheduled the moment the quote is sent.
Teams cut RFQ processing time by up to 85%, and pilot teams have seen a +6 percentage point win-rate lift. Zavin works alongside CargoWise and Magaya, and goes live in under 14 days with no migration.
Bottom line
A freight quote template is twelve fields and a habit. Print the cargo basis, tie validity to a date and an event, break the price into origin, freight and destination, and name what is excluded. Do that on every quote, and the customer can say yes without writing back.
See how quotes are prepared from the inbox in freight quote automation software, or book a 30-minute walkthrough.